© 2018 Envirotech Energy Solutions Ltd.

Powered by HDP Solutions UK.

The South Quay Building, 189 Marsh Wall | London | E14 9SH
info@envirotech-es.com | +44 (0) 203 8744620

UK’s second subsidy-free solar farm completed by West Sussex Council using battery storage

November 9, 2018

The UK’s second subsidy-free solar farm, and the first by a local authority using battery storage, has been completed by West Sussex County Council in a project that ticked “every box” and will generate significant income over the next 25 years.

 

The Westhampnett project combines 7.4MW of solar, comprised of panels from Hanwha Q Cells, with a 4.4MW/4.06MWh battery storage unit from Tesvolt on a closed 35 acre landfill site close to a local grid connection and owned by the council, offering low land costs for the project.

 

Read more...

Share on Facebook
Share on Twitter
Please reload

Recent Posts
Please reload

Archive
Please reload

Search By Tags
Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square