© 2018 Envirotech Energy Solutions Ltd.

Powered by HDP Solutions UK.

The South Quay Building, 189 Marsh Wall | London | E14 9SH
info@envirotech-es.com | +44 (0) 203 8744620

Battery Storage required to accommodate Renewable Energy Sources by UKPN alone.

October 5, 2018

UK Power Networks has laid out its vision for a ‘flexibility first’ approach in the coming years, including procuring a forecast 206MW in place of network reinforcement.

 

The distribution network operator (DNO) today outlined its flexibility roadmap from 2019/20 onwards, due largely to the network’s concern over the rise of electric vehicles within its network area.

 

Sotiris Georgiopoulos, head of smart grid development at UKPN, said in London: "We are an industry in flux [and] in transition, we are moving away from the old business model of centralised generation into the new business model where a lot of the generation - currently 30% - is actually connected on the distribution network. This is expected to increase over the years to come."

 

This has already seen UKPN accept 1.2GW of energy storage application, on top of the 177MW already connected.

Share on Facebook
Share on Twitter
Please reload

Recent Posts
Please reload

Archive
Please reload

Search By Tags
Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square